- REGION: Loreto
- SUPREME DECREE: 003-2001-EM
- SUPREME DECREE DATE: January 31, 2001
- SIGNING DATE: March 06, 2001
- AREA: 141,003.357 ha
- EFFECTIVE PERIOD Second
- INVESTMENT TO DECEMBER 2006: (Thousands US
$) 8,059.92
- COMMENTS:Preparing three wildcats drilling project and to acquire 225 km. 2D seismic
PERIOD |
WORK COMMITMENT |
1st |
Re-processing and interpretation
of at least 500 km 2D seismic and drilling one exploratory
well. |
2nd |
Drill one exploratory well. |
3rd |
Drill one exploratory
well. |
4th |
Drill one exploratory
well. |
|
| |
- REGION: Maynas - Loreto.
- SUPREME DECREE 028-99-EM
- SUPREME DECREE DATE: July 08,1999
- SIGNING DATE: September 09,.1999
- AREA (ha) 420.870,90 ha
- EFFECTIVE PERIOD: Fifth
- INVESTMENT TO DECEMBER 2006: (Thousands US
$) 54,375.35
- COMMENTS:Preparing a program to acquire 1,030 km of 2D seismic lines. It is expected to start on April 2007.
| PERIOD |
WORK COMMITMENT |
| 1st |
Re-process of 1200 km of seismic.
Geological and geophysical studies. |
| 2nd |
Register 350 km of seismic. |
| 3rd |
Drill 1 exploratory well at
2300 m. |
| 4th |
Drill 1 exploratory well at
2300 m. |
| 5th |
Drill 1 exploratory well at
2300 m. |
|
| |
- REGION Junin – Ucayali - Cuzco
- SUPREME DECREE 43-2003-EM
- SUPREME DECREE DATE December 19, 2003
- SIGNING DATE January 27, 2004
- AREA (ha) 611.067,81 ha
- EFFECTIVE PERIOD 2°
- INVESTMENT TO DECEMBER 2006: (Thousands
US $) 4,300.61
- COMMENTS: Acquisition of 284 km. 2D seismic lines started. Preparing drilling of Kinteroni wildcat.
| PERIOD |
WORK COMMITMENT |
| 1st |
Geochemical studies and re-processing
of 500 km 2Dseismic. |
| 2nd |
Drill 1 exploratory well at
2300 m |
| 3rd |
Drill 1 exploratory well at
2300 m |
| 4th |
Drill 1 exploratory well at
2300 m |
| 5th |
Drill 1 exploratory well at
2300 m |
|
| |
- REGION LORETO
- SUPREME DECREE 33-95-EM
- SUPREME DECREE DATE: November 05, 1995
- SIGNING DATE December 07, 1995
- AREA (ha) 953.795,19 ha
- EFFECTIVE PERIOD: Fourth
- INVESTMENT TO DECEMBER 2006: (Thousands US
$) 96,601.08
- COMMENTS: Preparing a seismic acquisition program.
| PERIOD |
WORK COMMITMENT |
| 1st |
Re-process 1000 km 2D seismic |
| 2nd |
Re-process of 600 km 2D seismic
and carru out field workshops. |
| 3rd |
Drill 1 exploratory well at
4100 m |
| 4th |
Drill 1 exploratory well at
4100 m |
| 5th |
Drill 1 exploratory well at
4100 m |
| 6th |
Drill 1 exploratory well at
4100 m |
| |
|
|
| |
- REGION LORETO
- SUPREME DECREE 038-95-EM
- SUPREME DECREE DATE December 10, 1995
- SIGNING DATE December 13, 1995
- RETAINED AREA 101,931.686 HA
- EFFECTIVE PERIOD RETAINED AREA
- INVESTMENT TO DECEMBER 2006: (Thousands US
$) 70,458.93
- COMMENTS: Company declared commercial discovery. Preparing Development Initial Plan.
| PERIOD |
WORK COMMITMENT |
| RETAINED AREA |
Drilling and testing
of two (02) wells |
|
| |
- REGION: Ucayaliy
- SUPREME DECREE: 33-2003-EM
- SUPREME DECREE DATE: October 29, 2003
- SIGNING DATE: December 10, 2003
- AREA: 880.670,50 ha
- EFFECTIVE PERIOD: Second
- INVESTMENT TO DECEMBER 2006: (Thousands
US $) 7,069.83
- COMMENTS: Preparing Chipany and Sipan wildcats drilling prospects
| PERIOD |
WORK COMMITMENT |
| 1st |
Acquire 170 km
2D seismic |
| 2nd |
Drill 1 exploratory well at
2300 m. depth |
| 3rd |
Drill 1 exploratory well at
2300 m. depth |
| 4th |
Drill 1 exploratory well at
2300 m. depth |
| 5th |
Drill 1 exploratory well at
2300 m. depth |
|
| |
- REGION: TUMBES
- SUPREME DECREE: 040-2003-EM
- SUPREME DECREE DATE: December 04, 2003
- SIGNING DATE: December 12, 2003
- AREA: 191,441.16 Ha
- EFFECTIVE PERIOD: Second
- INVESTMENT TO DECEMBER 2006: (Thousands
US $) 284.85
- COMMENTS: Preparing acquisition of 2D and 3D seismic campaigns.
| PERIOD |
WORK COMMITMENT |
| 1st |
40 UTE or Re-processing
250 km of 2D Seismic, Field Geology and Geophysics |
| 2nd |
70 UTE or acquisition of 100
km 2D Seismic and integral Evaluation of the Area and
prospects. |
| 3rd |
117 UTE or Drilling one (01)
exploratory well |
| 4th |
117 UTE or Drilling one (01)
exploratory well |
| 5th |
117 UTE or Drilling one (01)
exploratory well |
|
| |
- REGION: TUMBES
- SUPREME DECREE: 052-2001-EM
- SUPREME DECREE DATE: November 14, 2001
- SIGNING DATE: November 30, 2001
- AREA: 299,273.11 Ha
- EFFECTIVE PERIOD: Second
- INVESTMENT TO DECEMBER 2006: (Thousands US
$) 27,742.72
- COMMENTS:Preparing a production tests program.
| PERIOD |
WORK COMMITMENT |
| 1st |
Integral studies
of the Area and re-processing 250 km 2-D seismic and 500
km AVO |
| 2nd |
Preparing Structural Maps.
Study of Reserves and Development Plan Design |
| 3rd |
Acquisition of 300 km2 3D Seismic
or Drilling one (1) Exploratory Well |
| 4th |
300 UTE or Drilling one (1)
Exploratory Well |
| 5th |
225 UTE or Drilling one (1)
Exploratory Well |
|
| |
- REGION: PIURA
- SUPREME DECREE: 005-2002-EM
- SUPREME DECREE DATE: February 20, 2002
- SIGNING DATE: March 20, 2002
- AREA: 1'063,528.987 ha
- EFFECTIVE PERIOD: Third
- INVESTMENT TO DECEMBER 2006: (Thousands
US $) 11,471.29
- COMMENTS: Interpreting 422 sq. km. 3D seismic acquired in Punta Bapo area.
| PERIOD |
WORK COMMITMENT |
| 1st |
Re-processing and
interpreting 1800 km 2D seismic; acquisition of 2000 km
2D seismic. |
| 2nd |
Acquisition of 150 km of 3D
seismic. |
| 3rd |
One Exploratory well |
| 4th |
One Exploratory well |
| 5th |
One Exploratory well |
| 6th |
One Exploratory well |
|
| |
- REGION: LORETO
- SUPREME DECREE:010-2005-EM
- SUPREME DECREE DATE: March 18, 2005
- SIGNING DATE: April 07, 2005
- AREA: 515,731.131 ha.
- EFFECTIVE PERIOD: First
- INVESTMENT TO DECEMBER 2006: (Thousands
US $): 696.26
- COMMENTS: Preparing EIA for seismic acquisition and drilling wildcats.
| PERIOD |
WORK COMMITMENT |
| First |
A technical study
involving technical, economical, marketing, regulation
and environmental aspects regarding the development of
the block (includes the EIA). |
| Second |
90 UTE or acquisition, processing
and interpretation of 4,500 km of arerogravimetry. |
| Third |
400 UTE or drilling a wild
cat |
| Fourth |
225 UTE or acquisition, processing
and interpretation of 75 km2 of 3D seismic. |
| Fifth |
400 UTE or drilling a wild
cat |
| Sixth |
400 UTE or drilling a wild
cat |
|
| |
- REGION: Lima
- SUPREME DECREE: 025-2004-EM
- SUPREME DECREE DATE: July 20, 2004
- SIGNING DATE: September 01, 2004
- AREA: 849,566.557 ha
- EFFECTIVE PERIOD: Second
- INVESTMENT TO DECEMBER 2006: (Thousands
US $): 12,101.47
- COMMENTS:Seismic acquisition suspended. It is expected to reinitiate by the end of February 2007.
| PERIOD |
WORK COMMITMENT |
| 1st |
Acquisition of
1500 km of 2D seismic. |
| 2nd |
Acquisition of 150 km 3D seismic. |
| 3rd |
One Exploratory well |
| 4th |
One Exploratory well |
| 5th |
One Exploratory well |
|
| |
|
|
Consultora
de Petróleo S.A. |
- REGION: Ucayali
- SUPREME DECREE: 002-2004-EM
- SUPREME DECREE DATE: February 5, 2004
- SIGNING DATE: March 26, 2004
- AREA: 7,700 Ha
- EFFECTIVE PERIOD: Second
- INVESTMENT TO DECEMBER 2006: (Thousands US
$): 461.64
- COMMENTS:Drilling Huaya 1X wildcat suspended due to mechanical problems.
| PERIOD |
WORK COMMITMENT |
| 1st |
80 UTE or Carry
out field geology works and submit the final report. |
| 2nd |
120 UTE or to acquire, process
and interpret 20 km of 2D seismic or drilling one (1)
Exploratory Well or one (1) Confirmatory Well. |
| 3rd |
120 UTE or drilling one (1)
Exploratory Well or one (1) Confirmatory Well. |
| 4th |
120 UTE or to acquire, process
and interpret 20 km of 2D seismic or drilling one (1)
Exploratory Well or one (1) Confirmatory Well. |
| 5th |
120 UTE or to acquire, process
and interpret 20 km of 2D seismic. |
| 6th |
120 UTE or drilling one (1)
Exploratory Well or one (1) Confirmatory Well. |
|
| |
- REGION: Loreto
- SUPREME DECREE: 05-2004-EM
- SUPREME DECREE DATE: March 15, 2004
- SIGNING DATE: April 02, 2004
- AREA: 744.434,48 ha
- EFFECTIVE PERIOD Second
- INVESTMENT TO DECEMBER 2006: (Thousands
US $): 1,900.35
- COMMENTS:Evaluating existing information.
| PERIOD |
WORK COMMITMENT |
| 1st |
Re-processing 1000
Km of 2D seismic. |
| 2nd |
Acquisition of 200 km 2D seismic. |
| 3rd |
Drilling 1 exploratory well
at 3500 m |
| 4th |
Drilling 1 exploratory well
at 3500 m |
| 5th |
Drilling 1 exploratory well
at 3500 m |
| 6th |
Drilling 1 exploratory well
at 3500 m |
|
| |
- REGION: Loreto – San Martin
- SUPREME DECREE: 26-2004-EM
- SUPREME DECREE DATE: July 20, 2004
- SIGNING DATE: August 09, 2004
- AREA: 870.896,17 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO DECEMBER 2006: (Thousands
US $): 7,375.04
- COMMENTS Processing 2D/3D combined seismic acquisition.
| PERIOD |
WORK COMMITMENT |
| 1st |
Geological and
Geophysical Studies |
| 2nd |
Drilling Exploratory Well at
2500 m |
| 3rd |
Drilling Exploratory Well at
2500 m |
| 4th |
Drilling Exploratory Well at
2500 m |
| 5th |
Drilling Exploratory Well at
2500 m |
| 6th |
Drilling Exploratory Well at
2500 m |
|
| |
|
|
Burlington
Resources Peru Limited |
- REGION: Loreto – San Martin
- SUPREME DECREE: 011-2005-EM
- SUPREME DECREE DATE: March 18, 2005
- SIGNING DATE: April 28, 2005
- AREA: 1’092,132.217 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO DECEMBER 2006: (Thousands
US $): 329.77
- COMMENTS The area of interest for seismic acquisition defined. 200 km. seismic lines are expected to be acquired.
| PERIOD |
WORK COMMITMENT |
| First |
Reprocessing 1000
km of 2D seismic lines, scanning and digitalizing 1500
km of 2D seismic lines, scanning and digitalizing the
existing gravimetric and magnetometric information, or
20 UTE |
| Second |
Acquisition, processing and
interpretation of 200 km of 2D seismic lines or 200 UTE |
| Third |
Drilling a wild cat or 437
UTE |
| Fourth |
Drilling a wild cat or 437
UTE |
| Fifth |
Drilling a wild cat or 350
UTE |
| Sixth |
Drilling a wild cat or 350
UTE |
|
| |
|
|
Ramshorn
International Limited, Sucursal del Peru, Shona Energy
International Limited, Sucursal del Peru, Andean Oil &
Gas S.A.C. |
- REGION: Loreto
- SUPREME DECREE: 051-2005-EM
- SUPREME DECREE DATE:, 2005
- SIGNING DATE: December 13, 2005
- AREA: 126,676.114 ha
- EFFECTIVE PERIOD 2 °
- INVESTMENT TO DECEMBER 2006: (Thousands US
$): 320.25
- COMMENTS: Preparing a seismic acquisition program.
|
| |
- REGION: Titicaca
- SUPREME DECREE: 052-2005-EM
- SUPREME DECREE DATE: November 30, 2005
- SIGNING DATE: December 13, 2005
- AREA: 443,213.186 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO DECEMBER 2006: (Thousands US
$) 181.70
- COMMENTS Preparing a seismic campaign in the Pusi and Juliaca areas.
|
| |
- REGION: Loreto
- SUPREME DECREE: 021-2005-EM
- SUPREME DECREE DATE: June 30, 2005
- SIGNING DATE: July 12, 2005
- AREA: 809,777.097 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO DECEMBER 2006: (Thousands
US $):859.67
- COMMENTS: Reprocessing 1,800 km. 2D seismic in progress. Preparing a 600 km. seismic acquisition by the end of the 2Q 2007.
|
| |
- REGION: Ucayali
- SUPREME DECREE: 029-2005-EM
- SUPREME DECREE DATE: August 11, 2005
- SIGNING DATE: September 01, 2005
- AREA: 1’267,674.645 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO DECEMBER 2006: (Thousands
US $): 575.74
- COMMENTS: Preparing a 800 km. seismic acquisition by the end of 3Q 2007. Aerogravimetry and aeromagnetometry acquisition is expected to start in February 2007.
|
| |
- REGION: Ucayali - Ene
- SUPREME DECREE: 036-2005-EM
- SUPREME DECREE DATE: October 06, 2005
- SIGNING DATE: December 13, 2005
- AREA: 1’241,675.952 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO DECEMBER 2006: (Thousands
US $): 697.51
- COMMENTS:: Evaluating the reprocessing of the existing seismic data.
|
| |
|
|
Repsol
Exploración Perú , Sucursal del Perú |
- REGION: Loreto – San Martin
- SUPREME DECREE: 053-2005-EM
- SUPREME DECREE DATE: November 30, 2005
- SIGNING DATE: December 16, 2005
- AREA: 899,754.854 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO DECEMBER 2006: (Thousands
US $):273.86
- COMMENTS: Evaluating the information obtained during the field geologic campaign.
|
| |
|
|
Petrobras
Energía Perú S.A. |
- REGION: Ucayali
- SUPREME DECREE: 054-2005-EM
- SUPREME DECREE DATE: November 30, 2005
- SIGNING DATE: December 13, 2005
- AREA: 1’483,104.910 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO DECEMBER 2006: (Thousands
US $)59.67
- COMMENTS: Reprocessing 1,000 km 2D seismic lines (Progress: 50%). .
|
| |
|
Sapet
Development Peru Inc., Sucursal del Peru |
- REGION: Madre de Dios
- SUPREME DECREE: 040-2005-EM
- SUPREME DECREE DATE: October 12, 2005
- SIGNING DATE: December 07, 2005
- AREA: 1’516,324.466 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO DECEMBER 2006: (Thousands
US $):300.92
- COMMENTS: Preliminary work as part of the commitment:Preparing a seismic reprocessing program to be started in June 2007
|
| |
|
Petrobras Energía Perú S.A |
- REGION: Marañon
- SUPREME DECREE: 055-2005-EM
- SUPREME DECREE DATE: November 30, 2005
- SIGNING DATE: December 13, 2005
- AREA:1’080,675.480 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO DECEMBER 2006: (Thousands
US $):163.39
- COMMENTS:Reprocessing 700 km 2D seismic lines (Progress: 45%). Geological studies (Progress: 40%).
|
| |
|
|
Sapet
Development Peru Inc., Sucursal del Peru |
- REGION: Madre de Dios
- SUPREME DECREE: 056-2005-EM
- SUPREME DECREE DATE: November 30, 2005
- SIGNING DATE: December 07, 2005
- AREA: 1’231,353.672 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO DECEMBER 2006: (Thousands
US $):291.90
- COMMENTS: Preparing a seismic reprocessing program to be started in June 2007
|
| |
- REGION: Loreto
- SUPREME DECREE: 057-2005-EM
- SUPREME DECREE DATE: November 30, 2005
- SIGNING DATE: December 13, 2005
- AREA: 241,226.680 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO DECEMBER 2006: (Thousands US
$): 673.69
- COMMENTS: Integral geological evaluation.
|
| |
- REGION: Salaverry
- SUPREME DECREE: 031-2005-EM
- SUPREME DECREE DATE: August 11, 2005
- SIGNING DATE: September 20, 2005
- AREA: 1’550,001.081 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO DECEMBER 2006: (Thousands US
$): 239.84
- COMMENTS: Interpretation of 4,722 km 2D seismic lines in progress. Making studies on the area outcrops
|
| |
|
|
Petrolera
Monterrico S.A. |
- REGION: Tumbes
- SUPREME DECREE: 001-2006-EM
- SUPREME DECREE DATE: January 05, 2006
- SIGNING DATE: January 19, 2006
- AREA: 6’355,947 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO DECEMBER 2006: (Thousands US
$):
- COMMENTS:Evaluating infornation.
|
| |
|
|
Hunt
Oil Company of Perú LLC |
- REGION: Madre de Dios
- SUPREME DECREE: 035-2005-EM
- SUPREME DECREE DATE: October 08, 2005
- SIGNING DATE: May 02, 2006
- AREA: 14,593 Sq. Km., 3’606,076
acres
- EFFECTIVE PERIOD 1°
- INVESTMENT TO DECEMBER 2006: (Thousands US
$):42.71
- COMMENTS:Preparing a geological campaign for the area.
|
| |
- REGION: Ucayali
- SUPREME DECREE: 020-2006-EM
- SUPREME DECREE DATE: March 22, 2006
- SIGNING DATE: May 04, 2006
- AREA: 988,023.237 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO DECEMBER 2006: (Thousands US
$):108.04
- COMMENTS:Reprocessing the existing seismic information and making gravimetric and magnetometric studies.
|
| |
- REGION: Ucayali
- SUPREME DECREE: 021-2006-EM
- SUPREME DECREE DATE: March 22, 2006
- SIGNING DATE: May 04, 2006
- AREA: 960,489.984 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO DECEMBER 2006: (Thousands US
$):108.49
- COMMENTS:Reprocessing the existing seismic information and making gravimetric and magnetometric studies.
|
| |
- REGION: Ucayali
- SUPREME DECREE: 022-2006-EM
- SUPREME DECREE DATE: March 22, 2006
- SIGNING DATE: May 04, 2006
- AREA: 975,022.977 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO DECEMBER 2006: (Thousands US
$):108.49
- COMMENTS:Reprocessing the existing seismic information and making gravimetric and magnetometric studies.
|
| |
- REGION: Sechura
- SUPREME DECREE: 024-2006-EM
- SUPREME DECREE DATE: April 19, 2006
- SIGNING DATE: May 04, 2006
- AREA:303,331.200 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO DECEMBER 2006: (Thousands US
$):1,119.06
- COMMENTS:Evaluating the existing technical information.
|
| |
117 |
Petrobras Energia Perú S.A. |
- REGION: Loreto
- SUPREME DECREE: 019-2006-EM
- SUPREME DECREE DATE: March 22, 2006
- SIGNING DATE: May 16, 2006
- AREA:1’368,525.123 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO DECEMBER 2006: (Thousands US
$): 50.76
- COMMENTS:Geological studies
|
| |
114 |
Pan Andean Resources PLC, Sucursal del Perú y Consultora de Petróleo |
- REGION: Ucayali
- SUPREME DECREE: 033-2006-EM
- SUPREME DECREE DATE: June 23, 2006
- SIGNING DATE: July 14, 2006
- AREA:: 770,727.581ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO DECEMBER 2006: (Thousands US
$):20.99
- COMMENTS:Initial seismic interpretation
|
| |
121 |
Barret Resources (Perú), Sucursal del Perú |
- REGION: Loreto
- SUPREME DECREE: 033-2006-EM
- SUPREME DECREE DATE: May 24, 2006
- SIGNING DATE: July 14, 2006
- AREA:: 351,933.163 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO DECEMBER 2006: (Thousands US
$):0.46
- COMMENTS:Organizing gravimetric and magnetometric data for reprocessing
|
| |
- REGION:Salaverry
- SUPREME DECREE: 033-2006-EM
- SUPREME DECREE DATE: June 23, 2006
- SIGNING DATE: July 14, 2006
- AREA: 999,995.388 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO DECEMBER 2006: (Thousands US
$):91.66
- COMMENTS: Interpretation of the reprocessed seismic information in progress
|
| |
123 |
Burlington Resources (Perú), Sucursal del Perú. |
- REGION: LORETO
- SUPREME DECREE: 049-2006-EM
- SUPREME DECREE DATE: August 18, 2006
- SIGNING DATE: September 29, 2006
- AREA: 1’256,259.297 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO DECEMBER 2006: (Thousands US
$):6.79
- COMMENTS:Aerogravimetry and aeromagnetometry acquisition program under preparation
|
| |
124 |
Burlington Resources (Perú), Sucursal del Perú. |
- REGION: LORETO
- SUPREME DECREE: 050-2006-EM
- SUPREME DECREE DATE: August 18, 2006
- SIGNING DATE: September 29, 2006
- AREA: 994,986.603 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO DECEMBER 2006: (Thousands US
$):6.37
- COMMENTS:Aerogravimetry and aeromagnetometry acquisition program under preparation.
|
| |
122 |
Gran Tierra Energy Corp.. |
- REGION: LORETO
- SUPREME DECREE: 055-2006-EM
- SUPREME DECREE DATE: September 26, 2006
- SIGNING DATE: November 03, 2006
- AREA: 492,766.073 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO DECEMBER 2006: (Thousands US
$):
- COMMENTS:Information workshops under preparation.
|
| |
- REGION:SANTIAGO
- SUPREME DECREE: 066-2006-EM
- SUPREME DECREE DATE: November 27, 2006
- SIGNING DATE: December 12, 2006
- AREA: 853,381.665 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO DECEMBER 2006: (Thousands US
$):
- COMMENTS
|
| |
125 |
Barret Resources Perú Corp. |
- REGION:HUALLAGA
- SUPREME DECREE: 067-2006-EM
- SUPREME DECREE DATE: November 27, 2006
- SIGNING DATE: December 12, 2006
- AREA:950,927.857 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO DECEMBER 2006: (Thousands US
$):
- COMMENTS
|
| |
|
Gran Tierra Energy Corp.. |
- REGION:LORETO
- SUPREME DECREE:068-2006-EM
- SUPREME DECREE DATE: November 27, 2006
- SIGNING DATE: December 12, 2006
- AREA:897,750.00 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO DECEMBER 2006: (Thousands US
$):
- COMMENTS
|