1-AB |
PLUSPETROL
NORTE S.A. |
- Location North Jungle
- Contract Signed 22-mar-86
- Area (ha) 497.027
- Type of Contract Exploitation
- Considered Investment 2006 (MMUS$) 52,00
- Contract License
PRODUCTION:
Oil (b/d) 27.446
ACTIVIVITIES:
On April 14th. begun the drilling
of the 1604D Shiviyacu well.
Production Chart:

|
|
- Location North Jungle
- Contract Signed 20-may-94
- Area (ha) 182.348,20
- Type of Contract Exploitation
- Considered Investment 2006 (MMUS$) 48.50
- Contract License
PRODUCTION:
Oil (b/d) 17,319
ACTIVIVITIES:
On April 21th. OSINERG raised the closing of the Pavayacu
Bateria 9 wells..
Production Chart:

|
|
- Location Northern Platform
- Contract Signed 16-nov-93
- Area (ha) 199.865,22
- Type of Contract Exploitation
- Considered Investment 2005 (MMUS$) 30.40
- Contract Operations
PRODUCTION
Oil (b/d) 11,937
Gas (MMPC/D) 9,670
ACTIVIVITIES
San Pedro's SP1-1x, SP1-3CD and SP1-6D wells continue their
production; neverthless, for transport capacity reasons their
not in full production. On the matter, the Contractor has
acquired a great transport capacity ship that allowed a continuing
production of the San Pedro wells. It is considered that the
ship will initiate activities on May at the end of the inspections
and the corresponding permissions.
On April 26th. finished the drilling of the SP1-2D well. At
the end of the month the well is closed after producing high
GOR oil.
Production Chart:

|
|
|
|
SAPET
DEVELOPMENT PERU INC. |
- Location Northeast
- Contract Signed 01-may-00
- Area (ha) 34.501
- Type of Contract Exploitation
- Considered Investment 2005 (MMUS$) 3.80
- Contract License
PRODUCTION:
Oil (b/d) 3,182
Gas (MMPC/D) 2,488
ACTIVIVITIES:
Third Stage (12/16/2005-12/15/2006) - Additional Work Programm.
Includes the drilling of 02 wells, the reaconditioning of
10 wells, the rehabilitation of 20 wells and the implementation
of a second water injection system. The Contractor fulfilled
the commitment of the drilling, reaconditioning and rehabilitation
of the wells; only is pending the implementation of the second
water injection system.
Production Chart:

|
|
|
|
PETROBRAS
ENERGIA PERU S.A. |
- Location Northeast
- Contract Signed 20-may-94
- Area (ha) 46.952
- Type of Contract Exploitation
- Considered Investment 2005 (MMUS$) 36.70
- Contract License
PRODUCTION:
Oil (b/d) 12,783
Gas (MMPC/D) 8,625
ACTIVIVITIES:
MINIMUM WORK PROGRAMM - LAW 28109
Second Stage (09/16/05 - 09/15/06)
Includes the drilling of 22 wells, the reaconditioning of
108 wells, the rehabilitation of 60 wells and the implementation
of a water injection project.
At April 30th, the Contractor has drilled 65 wells, reaconditioned
246 wells and rehabilitated 80 wells.
. Production Chart:

|
| |
- Location Central Jungle
- Contract Signed 30-mar-94
- Area (ha) 16.630
- Type of Contract Exploitation
- Considered Investment 2005 (MMUS$) 0,50
- Contract License
PRODUCTION:
Oil (b/d) 3,153
Gas (MMPC/D) 15,092
ACTIVIVITIES:
During April 2006 the wells of the
Aguaytia field, as well as the Separation and Fractioning
Plants and the pipeline system for recolection, re-injection
and transportation operated normally. Neverthless, the production
of Natural Gas and LGN was restricted because smaller gas
sales due the shutdown for programmed maintenance of one of
the electrical generation turbines from the Aguaytia Thermoelectrial
Plant.
The wells production has an average of 62.35 MMPCD of natural
gas, originated from the 2, 5 and 6 wells. Also, was reinjected
a daily average of 42.02 MMPCD of dry gas in the 3, 7 and
8 wells.
The gas sales to the Aguaytia Thermoelectrial Plant were an
average of 14.94 MMPCD and the gas consume of the Pucallpa
Fractioning Plant was 0.16 MMPCD.
. Production Chart:

|
| |
|
|
PLUSPETROL
PERU CORPORATION S.A. - PROYECTO CAMISEA |
- Location: Ucayali Basin
- Contract Signed: 09-dic-00
- Area (ha): 143.500,00
- Type of Contract Exploitation
- Considered Investment 2005 (MMUS$): 41,30
- Contract: License
PRODUCTION
Barrels per day (b/d) 36,324
Gas (MMPC/D) 46,294
ACTIVIVITIES:
On april 2006, were normally made the production, transport
and processing activities related to the Camisea Project,
either in the Block 88 area than in the Malvinas Plant, the
Pipelines route and in the Pisco Facilities.
The field daily average production was 477.9 MMPCD of Natural
Gas. The field daily average reinjection was 390.1 MMPCD of
Dry Gas. In the Malvinas Plant was recovered a daily average
of 36,254 barrels per day of Gas Liquids. Was dispatched through
the pipeline a daily average of 51.7 MMPCD of Dry Gas.
Production Chart:

|
| |
|
I,
II, III, IV, V, IX, XV, 31B/D
OTHERS |
- Location: -
- Contract Signed: -
- Area (ha): 172,976
- Type of Contract Exploitation
- Considered Investment 2005 (MMUS$): 25.90
- Contract: License
PRODUCTION
Barrels per day (b/d) 4,405
Gas (MMPC/D)
Block I: 3,153
Block XIII 0.805
ACTIVIVITIES:
The production of this group of
wells ( 8 in the Northeast and 2 in the Central Jungle) on
April was4,405 b/d, greater in 269 b/d (6.5%) comparing with
the previous month. The production of this group of fields
represents 3.8% of the national total production of Liquids
Hydrocarbons.
Production Chart:

|
| |
- REGION: Loreto
- SUPREME DECREE: 003-2001-EM
- SUPREME DECREE DATE: January 31, 2001
- SIGNING DATE: June 03, 2001
- AREA: 141,003.357 ha
- EFFECTIVE PERIOD Second
- INVESTMENT TO MARCH 2006: (Thousands US
$) 7,652.94
- COMMENTS: Interpreting the existing seismic
information of the Santa Rosa structure
PERIOD |
WORK COMMITMENT |
1st |
Re-processing and interpretation
of at least 500 km 2D seismic and drilling one exploratory
well. |
2nd |
Drill one exploratory well. |
3rd |
Drill one exploratory
well. |
4th |
Drill one exploratory
well. |
|
| |
- REGION: Maynas - Loreto.
- SUPREME DECREE 028-99-EM
- SUPREME DECREE DATE: July 08,1999
- SIGNING DATE: September 09,.1999
- AREA (ha) 420.870,90 ha
- EFFECTIVE PERIOD: Fourth
- INVESTMENT TO MARCH 2006: (Thousands US
$) 24,322.01
- COMMENTS: Preparing program for acquisition
of 1,000 km. 2D seismic lines and drilling of wildcat “Raya”
| PERIOD |
WORK COMMITMENT |
| 1st |
Re-process of 1200 km of seismic.
Geological and geophysical studies. |
| 2nd |
Register 350 km of seismic. |
| 3rd |
Drill 1 exploratory well at
2300 m. |
| 4th |
Drill 1 exploratory well at
2300 m. |
| 5th |
Drill 1 exploratory well at
2300 m. |
|
| |
- REGION Junin – Ucayali - Cuzco
- SUPREME DECREE 43-2003-EM
- SUPREME DECREE DATE 12.19.2003
- SIGNING DATE 01.27.2004
- AREA (ha) 611.067,81 ha
- EFFECTIVE PERIOD 2°
- INVESTMENT TO MARCH 2006: (Thousands
US $) 1,583.37
- COMMENTS: Preparing selection process
for the acquisition of 500 km. of 2D seismic lines
| PERIOD |
WORK COMMITMENT |
| 1st |
Geochemical studies and re-processing
of 500 km 2Dseismic. |
| 2nd |
Drill 1 exploratory well at
2300 m |
| 3rd |
Drill 1 exploratory well at
2300 m |
| 4th |
Drill 1 exploratory well at
2300 m |
| 5th |
Drill 1 exploratory well at
2300 m |
|
| |
- REGION LORETO
- SUPREME DECREE 33-95-EM
- SUPREME DECREE DATE: November 05, 1995
- SIGNING DATE 12.07.1995
- AREA (ha) 953.795,19 ha
- EFFECTIVE PERIOD: Fourth
- INVESTMENT TO MARCH 2006: (Thousands US
$) 96,655.74
- COMMENTS: Restoring locations
| PERIOD |
WORK COMMITMENT |
| 1st |
Re-process 1000 km 2D seismic |
| 2nd |
Re-process of 600 km 2D seismic
and carru out field workshops. |
| 3rd |
Drill 1 exploratory well at
4100 m |
| 4th |
Drill 1 exploratory well at
4100 m |
| 5th |
Drill 1 exploratory well at
4100 m |
| 6th |
Drill 1 exploratory well at
4100 m |
| |
|
|
| |
- REGION LORETO
- SUPREME DECREE 038-95-EM
- SUPREME DECREE DATE December 10, 1995
- SIGNING DATE December 13, 1995
- RETAINED AREA 101,931.686 HA
- EFFECTIVE PERIOD RETAINED AREA
- INVESTMENT TO MARCH 2006: (Thousands US
$) 51,632.88
- COMMENTS: Under Retention period
| PERIOD |
WORK COMMITMENT |
| RETAINED AREA |
Drilling and testing
of two (02) wells |
|
| |
- REGION: Ucayaliy-Junin
- SUPREME DECREE: 33-2003-EM
- SUPREME DECREE DATE: October 29, 2003
- SIGNING DATE: December 10, 2003
- AREA: 880.670,50 ha
- EFFECTIVE PERIOD: Second
- INVESTMENT TO MARCH 2006: (Thousands
US $) 4,427.49
- COMMENTS: Designing wells Chipany and
Sipan drilling prospects.
| PERIOD |
WORK COMMITMENT |
| 1st |
Acquire 170 km
2D seismic |
| 2nd |
Drill 1 exploratory well at
2300 m. depth |
| 3rd |
Drill 1 exploratory well at
2300 m. depth |
| 4th |
Drill 1 exploratory well at
2300 m. depth |
| 5th |
Drill 1 exploratory well at
2300 m. depth |
|
| |
- REGION: TUMBES
- SUPREME DECREE: 040-2003-EM
- SUPREME DECREE DATE: December 04, 2003
- SIGNING DATE: December 12, 2003
- AREA: 191,441.16 Ha
- EFFECTIVE PERIOD: Second
- INVESTMENT TO MARCH 2006: (Thousands
US $) 262.61
- COMMENTS: Preparing selection process
for the 2D and 3D seismic campaigns.
| PERIOD |
WORK COMMITMENT |
| 1st |
40 UTE or Re-processing
250 km of 2D Seismic, Field Geology and Geophysics |
| 2nd |
70 UTE or acquisition of 100
km 2D Seismic and integral Evaluation of the Area and
prospects. |
| 3rd |
117 UTE or Drilling one (01)
exploratory well |
| 4th |
117 UTE or Drilling one (01)
exploratory well |
| 5th |
117 UTE or Drilling one (01)
exploratory well |
|
| |
- REGION: TUMBES
- SUPREME DECREE: 052-2001-EM
- SUPREME DECREE DATE: November 14, 2001
- SIGNING DATE: November 30, 2001
- AREA: 299,273.11 Ha
- EFFECTIVE PERIOD: Second
- INVESTMENT TO MARCH 2006: (Thousands US
$) 6,827.86
- COMMENTS: Preparing drilling prospect
for the Corvina structure.
| PERIOD |
WORK COMMITMENT |
| 1st |
Integral studies
of the Area and re-processing 250 km 2-D seismic and 500
km AVO |
| 2nd |
Preparing Structural Maps.
Study of Reserves and Development Plan Design |
| 3rd |
Acquisition of 300 km2 3D Seismic
or Drilling one (1) Exploratory Well |
| 4th |
300 UTE or Drilling one (1)
Exploratory Well |
| 5th |
225 UTE or Drilling one (1)
Exploratory Well |
|
| |
- REGION: PIURA
- SUPREME DECREE: 005-2002-EM
- SUPREME DECREE DATE: February 20, 2002
- SIGNING DATE: March 20, 2002
- AREA: 1'063,528.987 ha
- EFFECTIVE PERIOD: Second
- INVESTMENT TO MARCH 2006: (Thousands
US $) 9,988.34
- COMMENTS: Second exploration period final
report submitted.
| PERIOD |
WORK COMMITMENT |
| 1st |
Re-processing and
interpreting 1800 km 2D seismic; acquisition of 2000 km
2D seismic. |
| 2nd |
Acquisition of 150 km of 3D
seismic. |
| 3rd |
One Exploratory well |
| 4th |
One Exploratory well |
| 5th |
One Exploratory well |
| 6th |
One Exploratory well |
|
| |
- REGION: LORETO
- SUPREME DECREE:010-2005-EM
- SUPREME DECREE DATE: March 18, 2005
- SIGNING DATE: April 07, 2005
- AREA: 515,731.131 ha.
- EFFECTIVE PERIOD: First
- INVESTMENT TO MARCH 2006: (Thousands
US $):
- COMMENTS: Preparing information workshops
for the communities.
| PERIOD |
WORK COMMITMENT |
| First |
A technical study
involving technical, economical, marketing, regulation
and environmental aspects regarding the development of
the block (includes the EIA). |
| Second |
90 UTE or acquisition, processing
and interpretation of 4,500 km of arerogravimetry. |
| Third |
400 UTE or drilling a wild
cat |
| Fourth |
225 UTE or acquisition, processing
and interpretation of 75 km2 of 3D seismic. |
| Fifth |
400 UTE or drilling a wild
cat |
| Sixth |
400 UTE or drilling a wild
cat |
|
| |
- REGION: Piura
- SUPREME DECREE: 025-2004-EM
- SUPREME DECREE DATE: July 20, 2004
- SIGNING DATE: September 01, 2004
- AREA: 849,566.557 ha
- EFFECTIVE PERIOD: First
- INVESTMENT TO MARCH 2006: (Thousands
US $): 2,128.79
- COMMENTS: The first step of the 788 sq.
km. of 3D seismic acquisition started on April 05, 2006.
To the end of April 119 sq km (15.2%) were completed.
| PERIOD |
WORK COMMITMENT |
| 1st |
Acquisition of
1500 km of 2D seismic. |
| 2nd |
Acquisition of 150 km 3D seismic. |
| 3rd |
One Exploratory well |
| 4th |
One Exploratory well |
| 5th |
One Exploratory well |
|
| |
|
|
Consultora
de Petróleo S.A. |
- REGION: Ucayali
- SUPREME DECREE: 002-2004-EM
- SUPREME DECREE DATE: February 5, 2004
- SIGNING DATE: March 26, 2004
- AREA: 7,700 Ha
- EFFECTIVE PERIOD: Second
- INVESTMENT TO MARCH 2006: (Thousands US
$): 72.64
- COMMENTS: Preparing the first wildcat
prognosis.
| PERIOD |
WORK COMMITMENT |
| 1st |
80 UTE or Carry
out field geology works and submit the final report. |
| 2nd |
120 UTE or to acquire, process
and interpret 20 km of 2D seismic or drilling one (1)
Exploratory Well or one (1) Confirmatory Well. |
| 3rd |
120 UTE or drilling one (1)
Exploratory Well or one (1) Confirmatory Well. |
| 4th |
120 UTE or to acquire, process
and interpret 20 km of 2D seismic or drilling one (1)
Exploratory Well or one (1) Confirmatory Well. |
| 5th |
120 UTE or to acquire, process
and interpret 20 km of 2D seismic. |
| 6th |
120 UTE or drilling one (1)
Exploratory Well or one (1) Confirmatory Well. |
|
| |
- REGION: Loreto
- SUPREME DECREE: 05-2004-EM
- SUPREME DECREE DATE: March 15, 2004
- SIGNING DATE: April 02, 2004
- AREA: 744.434,48 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO MARCH 2006: (Thousands
US $): 1,808.03
- COMMENTS: Evaluating the direct detection
of hydrocarbons using remote sensing techniques.
| PERIOD |
WORK COMMITMENT |
| 1st |
Re-processing 1000
Km of 2D seismic. |
| 2nd |
Acquisition of 200 km 2D seismic. |
| 3rd |
Drilling 1 exploratory well
at 3500 m |
| 4th |
Drilling 1 exploratory well
at 3500 m |
| 5th |
Drilling 1 exploratory well
at 3500 m |
| 6th |
Drilling 1 exploratory well
at 3500 m |
|
| |
- REGION: Loreto – San Martin
- SUPREME DECREE: 26-2004-EM
- SUPREME DECREE DATE: July 20, 2004
- SIGNING DATE: August 09, 2004
- AREA: 870.896,17 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO MARCH 2006: (Thousands
US $): 1,328.76
- COMMENTS : The company to acquire the
seismic data was selected.
| PERIOD |
WORK COMMITMENT |
| 1st |
Geological and
Geophysical Studies |
| 2nd |
Drilling Exploratory Well at
2500 m |
| 3rd |
Drilling Exploratory Well at
2500 m |
| 4th |
Drilling Exploratory Well at
2500 m |
| 5th |
Drilling Exploratory Well at
2500 m |
| 6th |
Drilling Exploratory Well at
2500 m |
|
| |
|
|
Burlington
Resources Peru Limited |
- REGION: Loreto – San Martin
- SUPREME DECREE: 011-2005-EM
- SUPREME DECREE DATE: March 18, 2005
- SIGNING DATE: April 28, 2005
- AREA: 1’092,132.217 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO MARCH 2006: (Thousands
US $): 121.21
- COMMENTS : Evaluation of wells Margarita
1C and Tigre 131
| PERIOD |
WORK COMMITMENT |
| First |
Reprocessing 1000
km of 2D seismic lines, scanning and digitalizing 1500
km of 2D seismic lines, scanning and digitalizing the
existing gravimetric and magnetometric information, or
20 UTE |
| Second |
Acquisition, processing and
interpretation of 200 km of 2D seismic lines or 200 UTE |
| Third |
Drilling a wild cat or 437
UTE |
| Fourth |
Drilling a wild cat or 437
UTE |
| Fifth |
Drilling a wild cat or 350
UTE |
| Sixth |
Drilling a wild cat or 350
UTE |
|
| |
|
|
Ramshorn
International Limited, Sucursal del Peru, Shona Energy
International Limited, Sucursal del Peru, Andean Oil &
Gas S.A.C. |
- REGION: Loreto
- SUPREME DECREE: 051-2005-EM
- SUPREME DECREE DATE: December 02, 2005
- SIGNING DATE: December 02, 2005
- AREA: 126,676.114 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO MARCH 2006: (Thousands US
$): 51.11
- COMMENTS: Geological field work to define
the seismic acquisition in areas out of the block
|
| |
- REGION: Titicaca
- SUPREME DECREE: 052-2005-EM
- SUPREME DECREE DATE: December 02, 2005
- SIGNING DATE: December 13, 2005
- AREA: 443,213 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO MARCH 2006: (Thousands US
$)
- COMMENTS : Preparing selection process
for the company that would be in charge of the first exploration
period commitment.
|
| |
- REGION: Loreto
- SUPREME DECREE: 021-2005-EM
- SUPREME DECREE DATE: June 30, 2005
- SIGNING DATE: July 12, 2005
- AREA: 809,777.097 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO MARCH 2006: (Thousands
US $): 247.90
- COMMENTS: Tests for reprocessing the
block seismic information in progress.
|
| |
- REGION: Ucayali
- SUPREME DECREE: 029-2005-EM
- SUPREME DECREE DATE: August 11, 2005
- SIGNING DATE: September 01, 2005
- AREA: 1’267,674.645 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO MARCH 2006: (Thousands
US $): 182.46
- COMMENTS: Acquisition of 1,000 km of
2D seismic lines, aerogravimetry and aeromagnetometry under
preparation.
|
| |
- REGION: Ucayali - Ene
- SUPREME DECREE: 036-2005-EM
- SUPREME DECREE DATE: October 09, 2005
- SIGNING DATE: December 13, 2005
- AREA: 1’241,675.952 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO MARCH 2006: (Thousands
US $): 624.32
- COMMENTS: Making remote sensing interpretations
and evaluating the reprocessing of the existing seismic
data.
|
| |
|
|
Repsol
Exploración Perú , Sucursal del Perú |
- REGION: Loreto – San Martin
- SUPREME DECREE: 053-2005-EM
- SUPREME DECREE DATE: December 02, 2005
- SIGNING DATE: December 16, 2005
- AREA: 899,754.854 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO MARCH 2006: (Thousands
US $):
- COMMENTS: Field geology campaign under
preparation.
|
| |
|
|
Petrobras
Energía Perú S.A. |
- REGION: Ucayali
- SUPREME DECREE: 054-2005-EM
- SUPREME DECREE DATE: December 02, 2005
- SIGNING DATE: December 13, 2005
- AREA: 1’483,104.910 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO MARCH 2006: (Thousands
US $):
- COMMENTS: Selecting 1,000 km of 2D seismic
lines that will be reprocessed as part of the commitment.
|
| |
|
|
Sapet
Development Peru Inc., Sucursal del Peru |
- REGION: Madre de Dios
- SUPREME DECREE: 040-2005-EM
- SUPREME DECREE DATE: October 12, 2005
- SIGNING DATE: December 07, 2005
- AREA: 1’516,324.466 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO MARCH 2006: (Thousands
US $):
- COMMENTS: Selecting the block existing
technical information
|
| |
|
|
Sapet
Development Peru Inc., Sucursal del Peru |
- REGION: Madre de Dios
- SUPREME DECREE: 056-2005-EM
- SUPREME DECREE DATE: December 02, 2005
- SIGNING DATE: December 07, 2005
- AREA: 1’231,353.672 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO MARCH 2006: (Thousands
US $):
- COMMENTS: Selecting the block existing
technical information
|
| |
- REGION: Ucayali
- SUPREME DECREE: 057-2005-EM
- SUPREME DECREE DATE: December 02, 2005
- SIGNING DATE: December 13, 2005
- AREA: 241,226.680 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO MARCH 2006: (Thousands US
$): 147.38
- COMMENTS: Scanning of 430 km of 2D seismic
lines completed.
|
| |
- REGION: Salaverry
- SUPREME DECREE: 031-2005-EM
- SUPREME DECREE DATE: August 11, 2005
- SIGNING DATE: September 20, 2005
- AREA: 1’550,001.081 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO MARCH 2006: (Thousands US
$): 173.85
- COMMENTS: Interpreting the information
of 4,722 km of existing seismic lines (70%). Preparing the
acquisition of 2D and 3D seismic and the sea bottom sampling.
|
| |
|
|
Petrolera
Monterrico S.A. |
- REGION: Tumbes
- SUPREME DECREE: 001-2006-EM
- SUPREME DECREE DATE: January 05, 2006
- SIGNING DATE: January 19, 2006
- AREA: 6’355,947 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO MARCH 2006: (Thousands US
$):
- COMMENTS:
|
| |
|
|
Hunt
Oil Company of Perú LLC |
- REGION: Madre de Dios
- SUPREME DECREE: 035-2005-EM
- SUPREME DECREE DATE: October 08, 2005
- SIGNING DATE: May 02, 2006
- AREA: 14,593 Sq. Km., 3’606,076
acres
- EFFECTIVE PERIOD 1°
- INVESTMENT TO MARCH 2006: (Thousands US
$):
- COMMENTS:
|
| |
- REGION: Ucayali
- SUPREME DECREE: 020-2006-EM
- SUPREME DECREE DATE: March 23, 2006
- SIGNING DATE: May 04, 2006
- AREA: 988,023.237 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO MARCH 2006: (Thousands US
$):
- COMMENTS:
|
| |
- REGION: Ucayali
- SUPREME DECREE: 021-2006-EM
- SUPREME DECREE DATE: March 23, 2006
- SIGNING DATE: May 04, 2006
- AREA: 960,489.984 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO MARCH 2006: (Thousands US
$):
- COMMENTS:
|
| |
- REGION: Ucayali
- SUPREME DECREE: 022-2006-EM
- SUPREME DECREE DATE: March 23, 2006
- SIGNING DATE: May 04, 2006
- AREA: 975,022.977 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO MARCH 2006: (Thousands US
$):
- COMMENTS:
|
| |
- REGION: Sechura
- SUPREME DECREE: 024-2006-EM
- SUPREME DECREE DATE: April 20, 2006
- SIGNING DATE: May 04, 2006
- AREA:303,331.200 ha
- EFFECTIVE PERIOD 1°
- INVESTMENT TO MARCH 2006: (Thousands US
$):
- COMMENTS:
|
| |
|